CENELEC

Project
| Reference | EN 60904-1:2006 |
|---|---|
| Title | Photovoltaic devices - Part 1: Measurement of photovoltaic current-voltage characteristics |
| Project Number | 16857 |
| Abstract/Scope | Describes measurement procedures for current-voltage characteristics of crystalline silicon photovoltaic devices in natural or simulated sunlight. These procedures are applicable to a single solar cell, a sub-assembly of solar cells, or a flat module. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2006-11-24 |
| Current Stage code deadline | 2007-07-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 82 |
|---|---|
| Reference Document | IEC 60904-1:2006 (EQV) |
| ICS | 27.160 - Solar energy engineering |
| Keywords | Photovoltaic (PV) device; Photovoltaic (PV) current-voltage; Measurement |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2006-10-01 |
|---|---|
| date of Availability (DAV) (2) | 2006-11-24 |
| date of Announcement (DOA) (3) | 2007-01-01 |
| date of Publication (DOP) (4) | 2007-07-01 |
| date of Withdrawal (DOW) (5) | 2009-10-01 |
Relations
| Supersedes | EN 60904-1:1993 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN ISO/IEC 17025:2005
EN 60891:1994 EN 60904-2:1993 EN 60904-3:1993 EN 60904-5:1995 EN 60904-6:1994 EN 60904-7:1998 IEC 60904-9:1995 EN 60904-10:1998 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
