CENELEC

Project
| Reference | FprEN 62040-4:2013 |
|---|---|
| Title | Uninterruptible power systems (UPS) - Part 4: Environmental aspects - requirements and reporting |
| Project Number | 24151 |
| Abstract/Scope | IEC 62040-4:2013 specifies the process and requirements to declare the environmental aspects concerning uninterruptible power systems (UPS), with the goal of promoting reduction of any adverse environmental impact during a complete UPS life cycle. This product standard is harmonized with the applicable generic and horizontal environmental standards and contains additional details relevant to UPS. This standard applies to movable, stationary and fixed UPS that deliver single or three-phase fixed frequency a.c. output voltage not exceeding 1 000 V a.c. and that present, generally through a d.c. link, an energy storage system and specified in IEC 62040 product standards for UPS. |
| Status |
Approval stage
|
Status
| Current Stage code | 5060 |
|---|---|
| Current Stage code date | 2013-04-08 |
| Current Stage code deadline | 2013-04-29 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 22H |
|---|---|
| Reference Document | IEC 62040-4:2013 (EQV) |
| ICS | 13.020.99 - Other standards related to environmental protection 29.200 - Rectifiers. Convertors. Stabilized power supply |
| Keywords | Uninterruptible; Power system; UPS; Environmental aspects; Reporting |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 3 months |
| date of Publication (DOP) (4) | dor + 9 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
