CENELEC

Project
| Reference | EN 60770-2:2003 |
|---|---|
| Title | Transmitters for use in industrial-process control systems - Part 2: Methods for inspection and routine testing |
| Project Number | 14184 |
| Abstract/Scope | applies to transmitters, which have either a standard analogue electric current output signal or a standard pneumatic output signal in accordance with EN 60381-1 or EN 60382. The tests detailed herein may be applied to transmitters which have other output signals, provided that due allowance is made for such differences. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2003-04-24 |
| Current Stage code deadline | 2004-01-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 65B |
|---|---|
| Reference Document | IEC 60770-2:2003 (EQV) |
| ICS | 17.020 - Metrology and measurement in general 25.040.40 - Industrial process measurement and control |
| Keywords | Transmitter; Industrial-process; Inspection; Test |
| Note | Superseded by EN 60770-2:2010 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2003-04-01 |
|---|---|
| date of Availability (DAV) (2) | 2003-04-24 |
| date of Announcement (DOA) (3) | 2003-07-01 |
| date of Publication (DOP) (4) | 2004-01-01 |
| date of Withdrawal (DOW) (5) | 2006-04-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | EN 60770-2:2010 |
| Normative reference (6) | IEC 60050-351:1998 HD 452.1 S1:1984 EN 60382:1993 IEC 60410:1973 EN 60770-1:1999 EN 61298-1:1995 EN 61298-2:1995 EN 61298-3:1998 EN 61298-4:1995 IEC 62098:2000 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
