CENELEC

Project
| Reference | EN 61395:1998 |
|---|---|
| Title | Overhead electrical conductors - Creep test procedures for stranded conductors |
| Project Number | 11860 |
| Abstract/Scope | Is applicable to non-interrupted creep-testing of stranded conductors for overhead lines such as those specified by IEC 61089. Procedures for interpreting the results are also included. The object of the test is principally to calculate creep for any purpose and to compare creep of different conductors. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1998-04-21 |
| Current Stage code deadline | 1999-01-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 7 |
|---|---|
| Reference Document | IEC 61395:1998 (EQV) |
| ICS | 29.240.20 - Power transmission and distribution lines |
| Keywords | Overhead conductor; Stranded conductor; Creep test procedure |
| Note | EN following parallel vote * D113/067: TC 7 disbanded |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 1998-04-01 |
|---|---|
| date of Availability (DAV) (2) | 1998-04-21 |
| date of Announcement (DOA) (3) | 1998-07-01 |
| date of Publication (DOP) (4) | 1999-01-01 |
| date of Withdrawal (DOW) (5) | 2001-01-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC 61089:1991 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
