CENELEC

Project
| Reference | FprEN 61753-031-6:2013 |
|---|---|
| Title | Fibre optic interconnecting devices and passive components - Performance standard - Part 031-6: Non-connectorised single-mode 1xN and 2xN non-wavelength-selective branching devices for Category O - Uncontrolled environment |
| Project Number | 21105 |
| Abstract/Scope | IEC 61753-031-6:2008(E) provides the minimum initial tests and measurement requirements and severities which a non-wavelength selective branching device (NWBD) should satisfy in order to be categorized as meeting the requirements of Category 0 (uncontrolled environment) as defined in Annex A of IEC 61753-1. |
| Status |
Approval stage
|
Status
| Current Stage code | 5020 |
|---|---|
| Current Stage code date | 2013-03-01 |
| Current Stage code deadline | 2013-06-07 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 86B |
|---|---|
| Reference Document | IEC 61753-031-6:201X (86B/3564/CDV) (EQV) |
| ICS | 33.180.10 - Fibres and cables |
| Keywords | |
| Note | D133/C035: VR not ratified - IEC 61753-031-6:2008 not harmonized at European level - Current edition of IEC excluded from parallel procedure (temporary exemption - standstill maintained) |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 3 months |
| date of Publication (DOP) (4) | dor + 9 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
