CENELEC

Project
| Reference | EN 62132-3:2007 |
|---|---|
| Title | Integrated circuits - Measurement of electromagnetic immunity, 150 kHz to 1 GHz - Part 3: Bulk current injection (BCI) method |
| Project Number | 17166 |
| Abstract/Scope | This part of IEC 62132 describes a bulk current injection (BCI) test method to measure the immunity of integrated circuits (IC) in the presence of conducted RF disturbances, e.g. resulting from radiated RF disturbances. This method only applies to ICs that have off-board wire connections e.g. into a cable harness. This test method is used to inject RF current on one or a combination of wires. This standard establishes a common base for the evaluation of semiconductor devices to be applied in equipment used in environments that are subject to unwanted radio frequency electromagnetic signals. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2007-10-10 |
| Current Stage code deadline | 2008-07-01 |
| Deadline date for vote |
Legal
| Directive(s) | EMC related (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 47A |
|---|---|
| Reference Document | IEC 62132-3:2007 (EQV) |
| ICS | 31.200 - Integrated circuits. Microelectronics |
| Keywords | Immunity; Electromagnetic; Integrated circuit; Bulk Current Injection; BCI |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2007-10-01 |
|---|---|
| date of Availability (DAV) (2) | 2007-10-10 |
| date of Announcement (DOA) (3) | 2008-01-01 |
| date of Publication (DOP) (4) | 2008-07-01 |
| date of Withdrawal (DOW) (5) | 2010-10-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 62132-1:2006
corr. November 2006 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
