International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 45510-2-2:1999
Title Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
Project Number 5107
Abstract/Scope  
Status
Published

Status

Current Stage code 6060
Current Stage code date 1999-04-21
Current Stage code deadline 1999-11-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher BC/CLC/92-04/1

Details

IEC Technical Body IEC/TC 108
Reference Document  
ICS 27.100 - Power stations in general
Keywords Power station; Electrical equipment; Uninterruptible power supply
Note CEN/CLC JTF PE converted into CEN/CLC TC 2
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information
5 Waste Recovery, Disposal B2B, B2C
16.2.4 Waste Disposal B2B, B2C
7.1 Waste Recovery, Disposal B2B, B2C
13.1 Others Raw Material, Manufacturing, Use, Recovery, Disposal B2B, B2C
7.1 Noise emissions Manufacturing, Use B2B, B2C
7.1 Emissions to air Manufacturing, Use, Recovery, Disposal B2B, B2C

History

Stage
Date
Deadline Date
Documents
6060 1999-04-21 1999-11-01 export to doc file  EN
6020 1998-11-01 1999-02-01  
5099 1998-10-01 1998-11-01  
5062 1998-09-08 1998-10-01  
5020 1998-05-13 1998-09-01  
4099 1998-01-29 1998-04-29  
4060 1996-11-18 1997-03-03  
4020 1994-10-14 1995-04-15  
3099 1994-09-02 1995-02-02  

Implementation Dates

date of Ratification (DOR) (1) 1998-10-01
date of Availability (DAV) (2) 1999-04-21
date of Announcement (DOA) (3) 1999-08-01
date of Publication (DOP) (4) 1999-11-01
date of Withdrawal (DOW) (5) 1999-11-01

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.