CENELEC

Project
| Reference | EN 60332-3-21:2009 |
|---|---|
| Title | Tests on electric and optical fibre cables under fire conditions - Part 3-21: Test for vertical flame spread of vertically-mounted bunched wires or cables - Category A F/R |
| Project Number | 16455 |
| Abstract/Scope | Specifies method of test for the assessment of vertical flame spread of vertically-mounted bunched wires or cables, electrical or optical, under defined conditions. The test is intended for type approval testing. The requirements for the selection of cables for testing are given. The flame spread is measured as the extent of damage of the cable sample. This procedure may be used to demonstrate the cable's ability to limit flame spread. Covers category A F/R and relates only to power cables of conductor cross-sectional area greater than 35 mm2 installed on the test ladder in a spaced configuration on the front and rear to achieve a nominal total volume of non-metallic material of 7 l/m of test sample. The flame application time is 40 min. This method of mounting is intended for special cable designs used in particular installations when required in the cable specification. Category A F/R is not intended for general use. A recommended performance requirement is also given. Has the status of a group safety publication in accordance with IEC Guide 104. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-10-07 |
| Current Stage code deadline | 2010-08-01 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 20 |
|---|---|
| Reference Document | IEC 60332-3-21:2000 (MOD) |
| ICS | 13.220.40 - Ignitability and burning behaviour of materials and products 29.020 - Electrical engineering in general 29.060.20 - Cables |
| Keywords | Cable; Fire conditions; Vertical; Flame; Category A F/R |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-08-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-10-07 |
| date of Announcement (DOA) (3) | 2010-02-01 |
| date of Publication (DOP) (4) | 2010-08-01 |
| date of Withdrawal (DOW) (5) | 2012-08-01 |
Relations
| Supersedes | EN 50266-2-1:2001 EN 50266-2-1:2001/corrigendum Mar. 2002 |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC Guide 104:1997 EN 60332-3-10:2009 EN 60695-4:1995 EN 60811-1-3:1995 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.