Project
| Reference | EN 50119:2009 |
|---|---|
| Title | Railway applications - Fixed installations - Electric traction overhead contact lines |
| Project Number | 14766 |
| Abstract/Scope | This European Standard applies to electric traction overhead contact line systems in heavy railways, light railways, trolley busses and industrial railways of public and private operators. It applies to new installations of overhead contact line systems and for the complete reconstruction of existing overhead contact line systems. This standard contains the requirements and tests for the design of overhead contact lines, requirements for structures and their structural calculations and verifications as well as the requirements and tests for the design of assemblies and individual parts. This standard does not provide requirements for conductor rail systems where the conductor rails are located adjacent to the running rails. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-09-30 |
| Current Stage code deadline | 2010-04-01 |
| Deadline date for vote | 2008-08-31 |
Legal
| Directive(s) | HSR (96/48/EC), CONRAIL (2001/16/EC), RAIL (2008/57/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 9 |
|---|---|
| Reference Document | |
| ICS | 29.280 - Electric traction equipment |
| Keywords | Railway application; Fixed installation; Overhead; Contact line |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 6060 | 2009-09-30 | 2010-04-01 | |
| 5099 | 2009-04-01 | 2009-08-01 | |
| 5061 | 2009-02-24 | 2009-04-01 | |
| 5060 | 2008-07-02 | 2008-08-02 | |
| 5020 | 2008-04-25 | 2008-06-27 | |
| 4099 | 2008-03-31 | 2008-04-30 | |
| 4060 | 2006-09-07 | 2007-06-15 | |
| 4020 | 2006-03-03 | 2006-09-01 | |
| 3099 | 2005-05-25 | 2005-11-30 | |
| 3020 | 2004-12-03 | 2005-06-03 | |
| 2020 | 2003-05-15 | 2004-11-09 | |
| 2020 | 2002-03-21 | 2003-05-15 | |
| 1000 | 2001-05-09 | 2001-11-09 |
Implementation Dates
| date of Ratification (DOR) (1) | 2009-04-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-09-30 |
| date of Announcement (DOA) (3) | 2009-10-01 |
| date of Publication (DOP) (4) | 2010-04-01 |
| date of Withdrawal (DOW) (5) | - |
Relations
| Supersedes | EN 50119:2001 |
|---|---|
| Superseded by | |
| Normative reference (6) |
HD 578 S1:1992
EN 50121-2:2006 EN 50122 series EN 50123 series EN 50124 series EN 50125-2:2002 EN 50149:2001 EN 50151:2003 EN 50152-2:2007 EN 50163:2004 EN 50182:2001 EN 50183:2000 EN 50189:2000 EN 50206-1 EN 50206-2 EN 50317:2002 EN 50318:2002 EN 50326:2002 EN 50341-1 EN 50345:2009 EN 50367 IEC 60050-811:1991 EN 60071 series EN 60099 series EN 60168:1994 EN 60265-1:1998 EN 60383 series EN 60433:1998 EN 60529:1991 EN 60660:1999 EN 60672 series EN 60889:1997 EN 60947-1:2007 EN 61109:2008 EN 61232:1995 IEC 61245:1993 EN 61284 EN 61325:1995 EN 61773:1996 EN 61952:2008 EN 62271-102 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.