CENELEC

Project
| Reference | EN 61000-4-13:2002/A1:2009 |
|---|---|
| Title | Electromagnetic compatibility (EMC) - Part 4-13: Testing and measurement techniques - Harmonics and interharmonics including mains signalling at a.c. power port, low frequency immunity tests |
| Project Number | 22062 |
| Abstract/Scope | Defines the immunity test methods and range of recommended basic test levels for electrical and electronic equipment with rated current up to 16 A per phase at disturbance frequencies up to and including 2 kHz (for 50 Hz mains) and 2,4 kHz (for 60 Hz mains) for harmonics and interharmonics on low voltage power networks. Establishes a common reference for evaluating the functional immunity of electrical and electronic equipment when subjected to harmonics and inter-harmonics and mains signalling frequencies. The test method documented in this part of EN 61000 describes a consistent method to assess the immunity of an equipment or system against a defined phenomenon. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-08-21 |
| Current Stage code deadline | 2010-04-01 |
| Deadline date for vote |
Legal
| Directive(s) | EMC related (2004/108/EC) |
|---|---|
| Mandate(s) | M/490 |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 77A |
|---|---|
| Reference Document | IEC 61000-4-13:2002/A1:2009 (EQV) |
| ICS | 33.100.20 - Immunity |
| Keywords | Electromagnetic compatibility; Harmonics; Mains signalling; Immunity; Measurement |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-07-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-08-21 |
| date of Announcement (DOA) (3) | 2009-10-01 |
| date of Publication (DOP) (4) | 2010-04-01 |
| date of Withdrawal (DOW) (5) | 2012-07-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
