CENELEC
CLC/TC 65X |
Industrial-process measurement, control and automation |

Project
| Reference | EN 62337:2012 |
|---|---|
| Title | Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones |
| Project Number | 23066 |
| Abstract/Scope | IEC 62337:2012 defines specific phases and milestones in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the 'completion-of-erection' milestone of the project and prior to the 'acceptance-of-the-plant' phase by the owner. Such activities need to be adapted for each type of process/plant concerned. This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision. The main changes with respect to the previous edition is: the definition of the documents mentioned in this standard is in accordance with future IEC 62708. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2012-04-13 |
| Current Stage code deadline | 2012-12-28 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 65E |
|---|---|
| Reference Document | IEC 62337:2012 (EQV) + corrigendum Dec. 2012 (EQV) |
| ICS | 25.040.40 - Industrial process measurement and control 91.010 - Construction industry 91.040 - Buildings |
| Keywords | Instrumentation; Control; Process industry; Milestone |
| Note | Supersedes EN 62337:2007 * 2012-03-09: Publication editing allocated to svandriessche@cencenelec.eu |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-03-28 |
|---|---|
| date of Availability (DAV) (2) | 2012-04-13 |
| date of Announcement (DOA) (3) | 2012-06-28 |
| date of Publication (DOP) (4) | 2012-12-28 |
| date of Withdrawal (DOW) (5) | 2015-03-28 |
Relations
| Supersedes | EN 62337:2007 |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 10628-2 EN 62079 EN 62424 ANSI/ISA S7.0.01 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
