CENELEC

Project
| Reference | EN 62132-8:2012 |
|---|---|
| Title | Integrated circuits - Measurement of electromagnetic immunity - Part 8: Measurement of radiated immunity - IC stripline method |
| Project Number | 23299 |
| Abstract/Scope | IEC 62132-8:2012 specifies a method for measuring the immunity of an integrated circuit (IC) to radio frequency (RF) radiated electromagnetic disturbances over the frequency range of 150 kHz to 3 GHz. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2012-09-21 |
| Current Stage code deadline | 2013-05-10 |
| Deadline date for vote |
Legal
| Directive(s) | EMC related (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 47A |
|---|---|
| Reference Document | IEC 62132-8:2012 (EQV) |
| ICS | 31.200 - Integrated circuits. Microelectronics |
| Keywords | Integrated; Circuit; Electromagnetic immunity; Radiated; Stripline method |
| Note | 2012-07-18 - Publication editing allocated to cpalagi@cencenelec.eu * To be read in conjunction with EN 62132-1. |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-08-10 |
|---|---|
| date of Availability (DAV) (2) | 2012-09-21 |
| date of Announcement (DOA) (3) | 2012-11-10 |
| date of Publication (DOP) (4) | 2013-05-10 |
| date of Withdrawal (DOW) (5) | 2015-08-10 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC 60050 series EN 61000-4-20 EN 62132-1:2006 corr. November 2006 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
