CENELEC

Project
| Reference | EN 62040-3:2011 |
|---|---|
| Title | Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements |
| Project Number | 22790 |
| Abstract/Scope | |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-06-10 |
| Current Stage code deadline | 2012-01-18 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 22H |
|---|---|
| Reference Document | IEC 62040-3:2011 (EQV) |
| ICS | 29.200 - Rectifiers. Convertors. Stabilized power supply |
| Keywords | Power problem; Uninterruptible; UPS; Performance; Test requirement |
| Note | Supersedes EN 62040-3:2001 + A11:2009 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-04-18 |
|---|---|
| date of Availability (DAV) (2) | 2011-06-10 |
| date of Announcement (DOA) (3) | 2011-07-18 |
| date of Publication (DOP) (4) | 2012-01-18 |
| date of Withdrawal (DOW) (5) | 2014-04-18 |
Relations
| Supersedes |
EN 62040-3:2001
EN 62040-3:2001/A11:2009 |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 7779:2010 EN 60038 EN 60068-2-1 EN 60068-2-2 EN 60068-2-27 EN 60068-2-31:2008 EN 60068-2-78 EN 60146-1-1:2010 EN 60146-2:2000 EN 60196 HD 60364-1 HD 60364-5-52 EN 60947-3 EN 60947-6-1 EN 60950-1 EN 60990 EN 61000-2-2:2002 EN 61000-3-2 IEC/TS 61000-3-4 EN 61000-3-12 EN 61000-4-30:2009 EN 61672-1 EN 62040-1:2008 corr. February 2009 EN 62040-2 EN 62310-3:2008 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
