CENELEC

Project
| Reference | EN 60191-6:2009 |
|---|---|
| Title | Mechanical standardization of semiconductor devices - Part 6: General rules for the preparation of outline drawings of surface mounted semiconductor device packages |
| Project Number | 22234 |
| Abstract/Scope | IEC 60191-6:2009 gives general rules for the preparation of outline drawings of surface-mounted semiconductor devices. It supplements IEC 60191-1 and IEC 60191-3. It covers all surface-mounted devices discrete semiconductors with lead count of greater or equal to 8, as well as integrated circuits classified as form E in Clause 3 of IEC 60191-4. This third edition of IEC 60191-6 cancels and replaces the second edition, published in 2004 and constitutes a technical revision. This edition includes the following significant changes with respect to the previous edition: a) scope is modified to cover all surface-mounted devices discrete semiconductors with lead count of greater or equal to 8; b) editorial modifications on several pages; and c) technical revision to ball grid array package (BGA) especially its geometrical drawing format. (two types of BGA would unify as one type as a result of revising drawing format. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-12-23 |
| Current Stage code deadline | 2010-09-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 47D |
|---|---|
| Reference Document | IEC 60191-6:2009 (EQV) |
| ICS | 31.080.01 - Semiconductor devices in general |
| Keywords | Semi-conductor; Outline drawing; Surface mounted; Package |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-12-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-12-23 |
| date of Announcement (DOA) (3) | 2010-03-01 |
| date of Publication (DOP) (4) | 2010-09-01 |
| date of Withdrawal (DOW) (5) | 2012-12-01 |
Relations
| Supersedes | EN 60191-6:2004 |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 1101:2004 EN 60191-1 EN 60191-4:1999 A1:2002 A2:2002 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
