International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Projet

Reference EN 60870-6-2:1995
Title Matériels et systèmes de téléconduite - Partie 6: Protocoles de téléconduite compatibles avec les normes ISO et les recommendations de l'UIT-T - Section 2: Utilisation des normes de base (couches OSI 1 à 4)
Project Number 6715
Abstract/Scope Considère les normes relatives aux couches 1 à 4 du modèle de référence OSI et décrit le rôle et les fonctions de chaque couche.
Status
Published

Statut

Current Stage code 6060
Current Stage code date 1995-11-21
Current Stage code deadline 1996-07-01
Deadline date for vote  

Légal

Directive(s)  
Mandate(s)  
Order Voucher  

Détails

IEC Technical Body IEC/TC 57
Reference Document IEC 60870-6-2:1995 (EQV)
ICS 33.200 - Telecontrol. Telemetering
Keywords  
Note EN following parallel vote
A-Deviation(s)  
Special National Condition(s)  

Environnement

Clause
Categories - Aspects
Cycle de vie du produit
Information

Histoire

Stage
Date
Deadline Date
Documents
6060 1995-11-21 1996-07-01 export to doc file  EN
6020 1995-10-20 1996-01-20  
5099 1995-09-20 1995-10-20  
5062 1995-08-25 1995-09-20  
5020 1995-04-07 1995-08-15  
1090 1995-04-05 1995-08-05  

Dates de mise en application

date of Ratification (DOR) (1) 1995-09-20
date of Availability (DAV) (2) 1995-11-21
date of Announcement (DOA) (3) 1996-01-01
date of Publication (DOP) (4) 1996-07-01
date of Withdrawal (DOW) (5) 1996-07-01

Rélations

Supersedes  
Superseded by  
Normative reference (6) ISO/IEC 8073:1992
IEC 60050-371:1984
IEC 60050-721:1991
IEC 60870-1-3:1990
IEC 60870-6-1:1995

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.