CENELEC

Projekt
| Reference | EN 62271-206:2011 |
|---|---|
| Title | Hochspannungs-Schaltgeräte und -Schaltanlagen - Teil 206: Spannungsanzeigesysteme für Bemessungsspannungen über 1 kV bis einschließlich 52 kV |
| Project Number | 22517 |
| Abstract/Scope | |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-03-11 |
| Current Stage code deadline | |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 17C |
|---|---|
| Reference Document | IEC 62271-206:2011 (EQV) |
| ICS | 29.130.10 - High voltage switchgear and controlgear |
| Keywords | |
| Note | Supersedes EN 61958:2001 |
| A-Deviation(s) | |
| Special National Condition(s) |
Umwelt
|
Abschnitt
|
Kategorie(n) – Aspekt(e)
|
Produkt-Lebenszyklus
|
Information
|
|---|
Geschichte
Übernahmedaten
| date of Ratification (DOR) (1) | 2011-03-03 |
|---|---|
| date of Availability (DAV) (2) | 2011-03-11 |
| date of Announcement (DOA) (3) | 2011-06-03 |
| date of Publication (DOP) (4) | 2011-12-03 |
| date of Withdrawal (DOW) (5) | 2014-03-03 |
Beziehungen
| Supersedes | EN 61958:2001 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 60060-1:2010
EN 60068-2-14:2009 EN 60068-2-75:1997 IEC 60529:2001 EN 61243-1:2005 EN 61243-2:1997 EN 61243-5:2001 EN 62271-1:2008 EN 62271-200:2004 EN 62271-201:2006 corr. November 2006 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
