International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference CECC 16 205-801:1994
Title T0-5 size relays - 2 change-over contacts/1 A
Project Number 1072
Abstract/Scope Electromechanical all-or-nothing relays. Monostable, 2 change-over, 1 A with or without transient suppression. Construction hermetically sealed by all-welded metal can TO5 size. Switching or circuit application: - Low-level: applicable; - High level: up to 1 A. In severe static environmental conditions. Coil data: Rated voltage range from 5 to 30 V d.c.. Rated power from 360 to 500 mW. Contact data: Contact arrangement: 2 change-over. Low-level: 10 mA max. / 10 mV to 30 mV. High current: - rated contact voltage: U1 = 28 V d.c.; - contact current: I1 = 1A, resistive load, I2 = 0,2 A, L = 0,32 H. Temperature range : Storage temperature: - 65 to 150°C; operating ambient temperature: - 65 to 125°C. Relays delivered with screening: To assessment level Y.
Status
Withdrawn

Status

Current Stage code 6060
Current Stage code date 1994-05-15
Current Stage code deadline 1994-11-15
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 94
Reference Document  
ICS  
Keywords Relay; 2 change-over; Contact 1 A
Note D147/C075: Obsolete standard withdrawn with immediate effect
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 1994-05-15 1994-11-15 export to doc file  EN

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2) 1994-05-15
date of Announcement (DOA) (3) -
date of Publication (DOP) (4) -
date of Withdrawal (DOW) (5) -

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.