CLC/TC 57

Power systems management and associated information exchange

 

Project

Reference EN 61850-7-410:2013
Title Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
Project Number 23149
Abstract/Scope IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2013-01-18
Current Stage code deadline 2013-09-04
Deadline date for vote  

Legal

Directive(s)  
Mandate(s) M/490
Order Voucher  

Details

IEC Technical Body IEC/TC 57
Reference Document IEC 61850-7-410:2012 (EQV)
ICS 33.200 - Telecontrol. Telemetering
Keywords Communication; Power utility; Automation; Hydroelectric; Power plant
Note Supersedes EN 61850-7-410:2007 * 2012-11-06: Publication processing allocated to cpalagi@cencenelec.eu
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2013-01-18 2013-09-04 export to doc file  EN  FR
5099 2012-12-04 2013-01-01  
5060 2012-10-08 2012-10-29 export to doc file  EN
5020 2012-08-03 2012-10-05  
3090 2011-05-20 2011-05-31  
5060 2011-03-14 2011-04-04 export to doc file  EN
5020 2010-10-08 2011-03-11  
1090 2010-10-05 2010-10-08  

Implementation Dates

date of Ratification (DOR) (1) 2012-12-04
date of Availability (DAV) (2) 2013-01-18
date of Announcement (DOA) (3) 2013-03-04
date of Publication (DOP) (4) 2013-09-04
date of Withdrawal (DOW) (5) 2015-12-04

Relations

Supersedes EN 61850-7-410:2007
Superseded by  
Normative reference (6) IEC/TS 61850-2
EN 61850-7-1
EN 61850-7-2:2010
EN 61850-7-3:2011
EN 61850-7-4:2010

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.