CENELEC

Project
| Reference | FprEN 61970-456:2013 |
|---|---|
| Title | Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles |
| Project Number | 23261 |
| Abstract/Scope | IEC 61970-456:2013 defines the subset of classes, class attributes, and roles from the CIM necessary to describe the result of state estimation, power flow and other similar applications that produce a steady-state solution of a power network, under a set of use cases which are included informatively in this standard. This standard is intended for two distinct audiences, data producers and data recipients, and may be read from those two perspectives. From the standpoint of model export software used by a data producer, the standard describes how a producer may describe an instance of a network case in order to make it available to some other program. From the standpoint of a consumer, the standard describes what that importing software must be able to interpret in order to consume solution cases. |
| Status |
Approval stage
|
Status
| Current Stage code | 5060 |
|---|---|
| Current Stage code date | 2013-04-03 |
| Current Stage code deadline | 2013-04-24 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | M/490 |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 57 |
|---|---|
| Reference Document | IEC 61970-456:2013 (EQV) |
| ICS | 33.200 - Telecontrol. Telemetering |
| Keywords | Energy; CIM; Power system |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 3 months |
| date of Publication (DOP) (4) | dor + 9 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
