International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 60601-2-18
Title Medical electrical equipment - Part 2-18: Particular requirements for basic safety and essential performance of endoscopic equipment
Project Number 21838
Abstract/Scope IEC 60601-2-18:2009 establishes particular basic safety and essential performance requirements for endoscopic equipment. The minimum safety requirements specified in this particular standard are considered to provide for a practical degree of safety in the operation of endoscopic equipment. IEC 60601-2-18:2009 amends and supplements IEC 60601-1:2005. This third edition cancels and replaces the second edition, published in 1996, and its Amendment 1 (2000). This edition constitutes a technical revision and has been aligned or harmonized with IEC 60601-1:2005. The main changes with respect to the previous edition include: - alignment of requirements with IEC 60601-1:2005; - inclusion of essential performance requirements; - the inclusion of energized endoscopes and energized endotherapy devices used through second and subsequent punctures within the scope of the standard; - reference to IEC 60601-2-2 for the dielectric strength testing of HF energized endotherapy devices, rather than defining different tests.
Status
Approval stage

Status

Current Stage code 5098
Current Stage code date 2012-05-30
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s) MDD (93/42/EEC)
Mandate(s) M/295
Order Voucher  

Details

IEC Technical Body IEC/SC 62D
Reference Document IEC 60601-2-18:2009 (EQV)
ICS 11.040.50 - Radiographic equipment
Keywords Medical; Safety; Endoscopic
Note Will supersede EN 60601-2-18:1996 + A1:2000 * 2011-07 TC advice: Amendment still under consideration * Negative assessment from MDD consultant * D141/066: VR dropped - D141/067: CLC/TC 62 & consultants to solve the negative assessment
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
5098 2012-05-30    
5091 2011-01-17    
5060 2009-01-09 2009-01-26 export to doc file  EN
5020 2008-04-11 2008-09-12  
1090 2008-04-08 2008-04-11  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) dor + 3 months
date of Publication (DOP) (4) dor + 9 months
date of Withdrawal (DOW) (5) dor + 36 months

Relations

Supersedes EN 60601-2-18:1996
EN 60601-2-18:1996/A1:2000
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.