Project
| Reference | FprEN 50518-1:2013 |
|---|---|
| Title | Monitoring and alarm receiving centre - Part 1: Location and construction requirements |
| Project Number | 24411 |
| Abstract/Scope | This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site. This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately. |
| Status |
Approval stage
|
Status
| Current Stage code | 5020 |
|---|---|
| Current Stage code date | 2013-03-29 |
| Current Stage code deadline | 2013-08-30 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | |
|---|---|
| Reference Document | |
| ICS | 13.320 - Alarm and warning systems |
| Keywords | |
| Note | 2013-03-12 - UAP editing allocated to aclausse@cencenelec.eu * D143/032: NWI approved having noted the NL comments and TC 79 feedback received thereon * 2013-02-26: Initial request for amendment converted into request for full revision of EN 50518-1:2010 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 6 months |
| date of Publication (DOP) (4) | dor + 12 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | EN 50518-1:2010 |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.