International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Projekt

Reference EN 62065:2002
Title Navigations- und Funkkommunikationsgeräte und -systeme für die Seeschifffahrt - Bahnregelungssysteme - Betriebs- und Leistungsanforderungen, Prüfverfahren und geforderte Prüfergebnisse
Project Number 13986
Abstract/Scope  
Status
Published

Status

Current Stage code 6060
Current Stage code date 2002-06-07
Current Stage code deadline 2003-02-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 80
Reference Document IEC 62065:2002 (EQV)
ICS 47.020.70 - Navigation and control equipment
Keywords  
Note EN following parallel vote
A-Deviation(s)  
Special National Condition(s)  

Umwelt

Abschnitt
Kategorie(n) – Aspekt(e)
Produkt-Lebenszyklus
Information

Geschichte

stage
Datum
Deadline Date
Documents
6060 2002-06-07 2003-02-01 export to doc file  EN
5099 2002-05-01 2002-07-01  
5061 2002-03-26 2002-05-01  
5020 2001-12-14 2002-02-15  
4099 2001-12-11 2001-12-14  
4020 2000-08-11 2001-01-15  
3099 2000-08-07 2000-08-11  

Übernahmedaten

date of Ratification (DOR) (1) 2002-05-01
date of Availability (DAV) (2) 2002-06-07
date of Announcement (DOA) (3) 2002-08-01
date of Publication (DOP) (4) 2003-02-01
date of Withdrawal (DOW) (5) 2005-05-01

Beziehungen

Supersedes  
Superseded by FprEN 62065:2013
Normative reference (6) IMO Resolution MSC.74(69) Annex 2:1998
IMO Resolution A.694 (17):1991
IMO Resolution A.830(19):1995
ISO 9000-1:1994
EN 60945:1997
EN 61108-1:1996
EN 61108-2:1998
EN 61162-1:2000
EN 61162-2:1998

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.