| Reference | EN 60255-11:2010 |
|---|---|
| Title | Measuring relays and protection equipment - Part 11: Voltage dips, short interruptions, variations and ripple on auxiliary power supply port |
| Project Number | 21612 |
| Abstract/Scope | IEC 60255-11:2008 specifies the general requirements for a.c. and d.c. power supplies, for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with those systems. The objective of the tests is to confirm that the equipment under test will operate correctly when energised and subjected to dips, interruptions and alternating components (ripple). The main differences with respect to the previous edition are as follows: addition of voltage dips and interruptions test in a.c.; addition of gradual shut-down/start-up test; addition of reversal of d.c. power supply polarity test. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2010-01-22 |
| Current Stage code deadline | 2010-09-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 95 |
|---|---|
| Reference Document | IEC 60255-11:2008 (EQV) |
| ICS | 29.120.70 - Relays |
| Keywords | Relay; Protection; Voltage dip; Interruption; Ripple |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-12-01 |
|---|---|
| date of Availability (DAV) (2) | 2010-01-22 |
| date of Announcement (DOA) (3) | 2010-03-01 |
| date of Publication (DOP) (4) | 2010-09-01 |
| date of Withdrawal (DOW) (5) | 2012-12-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | FprEN 60255-26:2013 |
| Normative reference (6) |
EN 60255-6:1994
corr. February 1995 EN 61000-4-11:2004 EN 61000-4-17:1999 EN 61000-4-29:2000 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.