CENELEC
CLC/TC 65X |
Industrial-process measurement, control and automation |

Project
| Reference | EN 61326-2-5:2013 |
|---|---|
| Title | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-5: Particular requirements - Test configurations, operational conditions and performance criteria for devices with field bus interfaces according to IEC 61784-1 |
| Project Number | 23331 |
| Abstract/Scope | IEC 61326-2-5:2012 treats the particular features for EMC testing of field devices with field bus interfaces. This part of IEC 61326 covers only the field bus interface of the equipment. This second edition cancels and replaces the first edition published in 2005. This edition constitutes a technical revision. The main technical changes are: Update with respect to IEC 61326-1:2012. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2013-01-11 |
| Current Stage code deadline | 2013-08-06 |
| Deadline date for vote |
Legal
| Directive(s) | EMC (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 65A |
|---|---|
| Reference Document | IEC 61326-2-5:2012 (EQV) |
| ICS | 17.220 - Electricity. Magnetism. Electrical and magnetic measurements 25.040.40 - Industrial process measurement and control 33.100 - Electromagnetic compatibility (EMC) |
| Keywords | Laboratory use; EMC requirement; Control; Measurement; Communication |
| Note | Supersedes EN 61326-2-5:2006 * To be read in conjunction with EN 61326-1 (PR=23326) * 65A/612/RVC established on 2011-09-09: FDIS decided*2012-10-09: Publication editing allocated to svandriessche@cencenelec.eu |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-11-06 |
|---|---|
| date of Availability (DAV) (2) | 2013-01-11 |
| date of Announcement (DOA) (3) | 2013-02-06 |
| date of Publication (DOP) (4) | 2013-08-06 |
| date of Withdrawal (DOW) (5) | 2015-11-06 |
Relations
| Supersedes | EN 61326-2-5:2006 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 61158-2:2010
EN 61158-3-3:2008 EN 61158-5-5:2008 EN 61158-6-10:2012 EN 61784-1:2010 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
