International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference HD 483.10 S1:1993
Title Sound system equipment - Part 10: Peak programme level meters
Project Number 2538
Abstract/Scope Applies to audio-frequency peak programme level meters, for use in equipment for broadcasting, sound reinforcement, sound recording and household entertainment. Does not apply to standard volume indicators which are dealt with in HD 483.17
Status
Published

Status

Current Stage code 6060
Current Stage code date 1993-02-17
Current Stage code deadline 1993-12-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 100
Reference Document IEC 60268-10:1991 (EQV)
ICS  
Keywords Sound system; Peak programme level meter
Note  
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 1993-02-17 1993-12-01 export to doc file  EN
5099 1992-12-09 1993-01-09  
5020 1992-04-01 1992-09-01  
1599 1991-12-10 1992-04-10  
1520 1991-07-04 1991-10-15  

Implementation Dates

date of Ratification (DOR) (1) 1992-12-09
date of Availability (DAV) (2) 1993-02-17
date of Announcement (DOA) (3) 1993-06-01
date of Publication (DOP) (4) 1993-12-01
date of Withdrawal (DOW) (5) 1993-12-01

Relations

Supersedes  
Superseded by  
Normative reference (6) EN 60065:1993
corr. November 1993
corr. September 1997
A11:1997
HD 483.1 S2:1989
HD 483.2 S2:1993
HD 483.3 S2:1992
HD 483.17 S1:1992

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.