CENELEC

Project
| Reference | FprEN 50603:2013 |
|---|---|
| Title | Balanced communication cabling in accordance with EN 50173-4 screened straight patch cords and straight work area cords for class E applications - detail specification |
| Project Number | 23984 |
| Abstract/Scope | This detail specification describes straight screened patch cords and patch cords and application-specific cords enabling the construction of Class E channels as defined in the EN 50173 series of standards. This detail specification describes cords of which the transmission characteristics are up to 250 MHz for digital communication. The test configuration is detailed in EN 61935-2. |
| Status |
Approval stage
|
Status
| Current Stage code | 5020 |
|---|---|
| Current Stage code date | 2013-03-15 |
| Current Stage code deadline | 2013-08-16 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | M/212 |
| Order Voucher |
Details
| IEC Technical Body | |
|---|---|
| Reference Document | |
| ICS | 33.120.10 - Coaxial cables. Waveguides |
| Keywords | Communication; Cabling; Patch cord; Work area cord; Class D applications |
| Note | 2013-01-28 - UAP editing allocated to fdufour@cencenelec.eu * D141/C086: NWI approved for ENQ + FV (modified January 2013 to UAP) |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 6 months |
| date of Publication (DOP) (4) | dor + 12 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
