CENELEC

Project
| Reference | EN 61083-2:1997 |
|---|---|
| Title | Digital recorders for measurements in high-voltage impulse tests - Part 2: Evaluation of software used for the determination of the parameters of impulse waveforms |
| Project Number | 7527 |
| Abstract/Scope | Is applicable to the processing of records taken by digital recorders used for measurements during tests with high-voltage impulses and high current impulses as specified in HD 588/EN 60060 series. It specifies the test procedures to be applied to assess the accuracy of software used to process and read the records of impulses and calibration signals. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1997-01-17 |
| Current Stage code deadline | 1997-09-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 42 |
|---|---|
| Reference Document | IEC 61083-2:1996 (EQV) |
| ICS | 17.220.20 - Measurement of electrical and magnetic quantities |
| Keywords | Measuring instrument; Digital recorder; HV impulse test |
| Note | EN following parallel vote |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 1996-12-09 |
|---|---|
| date of Availability (DAV) (2) | 1997-01-17 |
| date of Announcement (DOA) (3) | 1997-03-01 |
| date of Publication (DOP) (4) | 1997-09-01 |
| date of Withdrawal (DOW) (5) | 1997-09-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | FprEN 61083-2:2012 |
| Normative reference (6) |
HD 588.1 S1:1991
EN 60060-2:1994 A11:1998 EN 61083-1:1993 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
