CENELEC

Project
| Reference | EN 50085-1:2005/FprA1:2013 |
|---|---|
| Title | Cable trunking systems and cable ducting systems for electrical installations - Part 1: General requirements |
| Project Number | 22989 |
| Abstract/Scope | This European Standard specifies requirements and tests for cable trunking systems (CTS) and cable ducting systems (CDS) intended for the accommodation, and where necessary for the electrically protective separation, of insulated conductors, cables and possibly other electrical equipment in electrical and/or communication systems installations. The maximum voltage of these installations is 1 000 V a.c. and 1 500 V d.c. This standard does not apply to conduit systems, cable tray systems, cable ladder systems, power track systems or equipment covered by other standards. This Part 1 shall be used in conjunction with the relevant Part 2 for particular requirements. NOTE This Part 1 is not intended to be used by itself. |
| Status |
Approval stage
|
Status
| Current Stage code | 5060 |
|---|---|
| Current Stage code date | 2013-04-15 |
| Current Stage code deadline | 2013-05-06 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | |
|---|---|
| Reference Document | |
| ICS | 29.120.10 - Conduits for electrical purposes |
| Keywords | Cable; Trunking system; Ducting system |
| Note | 2013-04-17 - Publication editing allocated to cpalagi@cencenelec.eu 2012-08-08 - Formal Vote editing allocated to mherfurth@cencenelec.eu * D142/C097: extension of tdv approved to read 2013-02-28 * D137/073: NWI approved by BT with target date for vote: 2012-05-31 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 5060 | 2013-04-15 | 2013-05-06 | |
| 5020 | 2013-02-08 | 2013-04-12 | |
| 4099 | 2012-08-08 | ||
| 4060 | 2012-01-31 | 2012-03-28 | |
| 4020 | 2011-09-30 | 2012-01-27 | |
| 4093 | 2011-03-03 | 2011-10-31 | |
| 4060 | 2011-01-24 | 2011-03-17 | |
| 4020 | 2010-08-20 | 2011-01-21 | |
| 3099 | 2010-07-06 | 2010-09-16 | |
| 1099 | 2010-07-01 | ||
| 1000 | 2010-05-17 | 2010-06-30 |
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 6 months |
| date of Publication (DOP) (4) | dor + 12 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
