CENELEC

Project
| Reference | EN 62246-2:2008 |
|---|---|
| Title | Reed contact units - Part 2: Heavy-duty reed switches |
| Project Number | 20869 |
| Abstract/Scope | Applies to the switching performance of heavy-duty reed switches for use in industrial applications based upon IEC 62246-1. Specifies reliability tests, rated making and breaking capacities, rated impulse voltages, rated conditional short-circuit currents, temperature rise and construction testing in addition to the requirements of IEC 62246-1. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2008-01-31 |
| Current Stage code deadline | 2008-09-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 94 |
|---|---|
| Reference Document | IEC 62246-2:2007 (EQV) |
| ICS | 29.120.70 - Relays |
| Keywords | Reed contact unit; Switch; Heavy-duty |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2007-12-01 |
|---|---|
| date of Availability (DAV) (2) | 2008-01-31 |
| date of Announcement (DOA) (3) | 2008-03-01 |
| date of Publication (DOP) (4) | 2008-09-01 |
| date of Withdrawal (DOW) (5) | 2010-12-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | EN 62246-1:2011 |
| Normative reference (6) | IECQ 01:2003 IECEE 01:2006 IECEE 03:2006 EN 62246-1:2002 IEC QC 001002-1:1998 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
