CENELEC

Project
| Reference | EN 61280-2-2:2008 |
|---|---|
| Title | Fibre optic communication subsystem test procedures - Part 2-2: Digital systems - Optical eye pattern, waveform and extinction ratio measurement |
| Project Number | 21323 |
| Abstract/Scope | This part of IEC 61280 is to describe a test procedure to measure the eye pattern and waveform parameters such as rise time, fall time, overshoot, and extinction ratio. Alternatively, the waveform may be tested for compliance with a predetermined waveform mask. This edition includes the following significant technical changes with respect to the previous edition: - the necessity of DC coupling for extinction ratio measurement is clarified; - the definition of extinction ratio has been revised to better harmonize with ITU-T; and - the definition of OMA has been clarified. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2008-08-14 |
| Current Stage code deadline | 2009-03-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 86C |
|---|---|
| Reference Document | IEC 61280-2-2:2008 (EQV) |
| ICS | 33.180.01 - Fibre optic systems in general |
| Keywords | Fibre optic; Communication; Digital; Eye pattern; Extinction ratio |
| Note | Superseded by EN 61280-2-2:2012 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2008-06-01 |
|---|---|
| date of Availability (DAV) (2) | 2008-08-14 |
| date of Announcement (DOA) (3) | 2008-09-01 |
| date of Publication (DOP) (4) | 2009-03-01 |
| date of Withdrawal (DOW) (5) | 2011-06-01 |
Relations
| Supersedes | EN 61280-2-2:2005 |
|---|---|
| Superseded by | EN 61280-2-2:2012 |
| Normative reference (6) | ITU-T Recommendation G.957:1999 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
