International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference FprEN 50575:2014
Title Power, control and communication cables - Cables for general applications in construction works subject to reaction to fire requirements
Project Number 23570
Abstract/Scope  
Status
Enquiry stage

Status

Current Stage code 4099
Current Stage code date 2014-02-12
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s) CPD (89/106/EEC)
Mandate(s) M/443
Order Voucher  

Details

IEC Technical Body  
Reference Document  
ICS  
Keywords Power, Control; Communication; Cable; Fire
Note 2014-02-12 - Formal Vote editing allocated to svandriessche@cencenelec.eu (not dispatched to Consultant due to Contract situation). 2012-09-04 - Formal Vote editing allocated to cwintrip@cencenelec.eu * D139/C063: NWI approved * Project to be handled in collaboration with TC 46X and TC 86A
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
4099 2014-02-12    
4060 2012-06-18 2012-07-09 export to doc file  EN
4020 2012-01-13 2012-06-15 export to doc file  EN  FR  DE
3099 2011-10-28    
1099 2011-07-01    
1000 2011-03-25 2011-06-30  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) dor + 6 months
date of Publication (DOP) (4) dor + 12 months
date of Withdrawal (DOW) (5) dor + 36 months

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.