CENELEC

Project
| Reference | EN 62192:2009 |
|---|---|
| Title | Live working - Insulating ropes |
| Project Number | 21617 |
| Abstract/Scope | IEC 62192:2009 covers insulating ropes that are utilized during live working procedures in contact with parts of installations operating at voltages up to and including 800 kV r.m.s. Insulating ropes for live working procedure under rain and/or d.c. conditions are not covered by this standard. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-06-12 |
| Current Stage code deadline | 2010-02-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 78 |
|---|---|
| Reference Document | IEC 62192:2009 (EQV) |
| ICS | 13.260 - Protection against electric shock 29.240.20 - Power transmission and distribution lines 29.260.99 - Other electrical equipment for working in special conditions |
| Keywords | Live working; Insulation; Rope |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-05-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-06-12 |
| date of Announcement (DOA) (3) | 2009-08-01 |
| date of Publication (DOP) (4) | 2010-02-01 |
| date of Withdrawal (DOW) (5) | 2012-05-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 2307:2005 HD 588.1 S1:1991 HD 437 S1:1984 EN 61318:2008 EN 61477:2009 corr. March 2010 IEC 60417-DB |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
