CENELEC

Project
| Reference | EN 60793-1-30:2011 |
|---|---|
| Title | Optical fibres - Part 1-30: Measurement methods and test procedures - Fibre proof test |
| Project Number | 22669 |
| Abstract/Scope | IEC 60793-1-30:2010(E) describes procedures for briefly applying a specified tensile load as a proof test to continuous lengths of optical fibre. The tensile load is applied for as short a time as possible, yet sufficiently long to ensure the glass experiences the proof stress, typically much less than one second. This method is applicable to types A1, A2, A3 and B optical fibres. The main change with respect to the previous edition is an improved description of the procedure. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-02-18 |
| Current Stage code deadline | |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 86A |
|---|---|
| Reference Document | IEC 60793-1-30:2010 (EQV) |
| ICS | 33.180.10 - Fibres and cables |
| Keywords | Optic; Fibre; Measurement; Proof test |
| Note | Supersedes EN 60793-1-30:2002 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-01-02 |
|---|---|
| date of Availability (DAV) (2) | 2011-02-18 |
| date of Announcement (DOA) (3) | 2011-04-02 |
| date of Publication (DOP) (4) | 2011-10-02 |
| date of Withdrawal (DOW) (5) | 2014-01-02 |
Relations
| Supersedes | EN 60793-1-30:2002 |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
