CENELEC

Project
| Reference | EN 60076-16:2011 |
|---|---|
| Title | Power transformers - Part 16: Transformers for wind turbines applications |
| Project Number | 22613 |
| Abstract/Scope | IEC 60076-16:2011 applies to dry-type and liquid-immersed transformers for rated power 100 kVA up to 10 000 kVA for wind turbine applications having a winding with highest voltage for equipment up to and including 36 kV and at least one winding operating at a voltage greater than 1,1 kV. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-10-28 |
| Current Stage code deadline | 2012-06-29 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 14 |
|---|---|
| Reference Document | IEC 60076-16:2011 (EQV) |
| ICS | 29.180 - Transformers. Reactors |
| Keywords | Transformer; Power; Wind; Turbine |
| Note | 2011-09-22: Publication editing allocated to svandriessche@cencenelec.eu |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-09-29 |
|---|---|
| date of Availability (DAV) (2) | 2011-10-28 |
| date of Announcement (DOA) (3) | 2011-12-29 |
| date of Publication (DOP) (4) | 2012-06-29 |
| date of Withdrawal (DOW) (5) | 2014-09-29 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 12944 series EN 60076-1:2011 EN 60076-2:2011 EN 60076-3:2001 EN 60076-5:2006 IEC 60076-7:2005 IEC 60076-8:1997 EN 60076-11:2004 IEC 60076-12:2008 EN 60076-13:2006 EN 61100 EN 61378-1:2011 IEC 61378-3:2006 EN 61400-1:2005 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
