CENELEC

Project
| Reference | EN 60691:2003/A2:2010 |
|---|---|
| Title | Thermal-links - Requirements and application guide |
| Project Number | 22233 |
| Abstract/Scope | Applies to thermal-links, intended for incorporation in electrical appliances, electronic equipment and component parts thereof, normally intended for use indoors, in order to protect them against excessive temperatures under abnormal conditions. May be applicable to thermal-links for use under other than indoor conditions, provided that the climatic and other circum- stances in the immediate surroundings of such thermal-links are comparable with those in this standard. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2010-03-19 |
| Current Stage code deadline | 2010-12-01 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 32C |
|---|---|
| Reference Document | IEC 60691:2002/A2:2010 (EQV) |
| ICS | 29.120.50 - Fuses and other overcurrent protection devices |
| Keywords | Protection equipment; Thermal link; Application guide |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2010-03-01 |
|---|---|
| date of Availability (DAV) (2) | 2010-03-19 |
| date of Announcement (DOA) (3) | 2010-06-01 |
| date of Publication (DOP) (4) | 2010-12-01 |
| date of Withdrawal (DOW) (5) | 2013-03-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | prEN 60691 |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
