| Reference | EN 61970-1:2006 |
|---|---|
| Title | Interface de programmation d'application pour système de gestion d'énergie (EMS-API) - Partie 1: Lignes directrices et exigences générales |
| Project Number | 16053 |
| Abstract/Scope | Fournit un ensemble de lignes directrices et des capacités d'infrastructure générales nécessaires à l'application des normes d'interface EMS-API. Décrit des scénarios d'intégration types pour l'application de ces normes et l'intégration des types d'applications. Définit un modèle de référence et fournit un cadre général d'application des autres parties des normes EMS-API. |
| Status |
Published
|
Statut
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2006-05-09 |
| Current Stage code deadline | |
| Deadline date for vote |
Légal
| Directive(s) | |
|---|---|
| Mandate(s) | M/490 |
| Order Voucher |
Détails
| IEC Technical Body | IEC/TC 57 |
|---|---|
| Reference Document | IEC 61970-1:2005 (EQV) |
| ICS | 33.200 - Telecontrol. Telemetering |
| Keywords | |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environnement
|
Clause
|
Categories - Aspects
|
Cycle de vie du produit
|
Information
|
|---|
Histoire
Dates de mise en application
| date of Ratification (DOR) (1) | 2005-12-01 |
|---|---|
| date of Availability (DAV) (2) | 2006-05-09 |
| date of Announcement (DOA) (3) | 2006-04-01 |
| date of Publication (DOP) (4) | 2006-12-01 |
| date of Withdrawal (DOW) (5) | 2008-12-01 |
Rélations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
CLC/TS 61970-2:2005
EN 61970-301:2004 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn