CENELEC

Project
| Reference | CECC 96 101-801:1992 |
|---|---|
| Title | Manually operated rotary wafer switches - Spindle and panel sealed or non-sealed centre bush mounting - Solder plug or printed circuit terminations |
| Project Number | 1659 |
| Abstract/Scope | Manually operated rotary wafer switches. Spindle and panel sealed or non-sealed. Centre bush mounting. Solder lug or printed circuit terminations. Number of wafers 1 to 6. Type of contacts: brass, silver plated; silver alloy; silver alloy, gold plated. Shorting or non-shorting electrical contact. Max. switched voltage: 250 V a.c. and d.c. (res. load). Rated voltage: 250 V a.c. and d.c. Max. switched current: 500 mA a.c. and d.c. Max. switched power: 15 W d.c. or 15 VA a.c. Climatic category: 40/ 100/56. Assessment level D. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1992-12-15 |
| Current Stage code deadline | 1993-06-15 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 23J |
|---|---|
| Reference Document | |
| ICS | |
| Keywords | Switch; Rotary wafer switch; Manually operated; Centre bush mounting |
| Note | D96/132: CECC/SC 23JX disbanded |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 6060 | 1992-12-15 | 1993-06-15 |
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | 1992-12-15 |
| date of Announcement (DOA) (3) | - |
| date of Publication (DOP) (4) | - |
| date of Withdrawal (DOW) (5) | - |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
