International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 61280-1-4:2010
Title Fibre optic communication subsystem test procedures - Part 1-4: General communication subsystems - Light source encircled flux measurement method
Project Number 22010
Abstract/Scope IEC 61280-1-4:2009 sets forth a standard procedure for the collection of two-dimensional fibre optic nearfield greyscale data and subsequent reduction to one-dimensional data expressed as a set of three sampled parametric functions of radius from the fibre's optical centre. This revision of IEC 61280-1-4 continues to fulfil its original purpose, characterization of transmission light sources, which enables the accurate mathematical prediction of minimum guaranteed link length in 1 gigabit per second or greater fibre optic data communication systems. New to this revision is support for improved measurement precision of insertion loss in multimode fibre optic links through the characterization of measurement light sources.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2010-02-12
Current Stage code deadline 2010-11-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/SC 86C
Reference Document IEC 61280-1-4:2009 (EQV)
ICS 33.180.01 - Fibre optic systems in general
Keywords Fibre; Optic; Communication; Light source; Flux measurement
Note Supersedes EN 61280-1-4:2003
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2010-02-12 2010-11-01 export to doc file  EN  FR  DE
5099 2010-02-01 2010-03-01  
5061 2009-11-26 2010-02-01  
5060 2009-11-02 2009-11-16 export to doc file  EN
5020 2009-08-28 2009-10-30  
3090 2009-06-09 2009-09-30  
5060 2009-02-24 2009-03-09 export to doc file  EN
5020 2008-09-19 2009-02-20  
1090 2008-09-16 2008-09-19  

Implementation Dates

date of Ratification (DOR) (1) 2010-02-01
date of Availability (DAV) (2) 2010-02-12
date of Announcement (DOA) (3) 2010-05-01
date of Publication (DOP) (4) 2010-11-01
date of Withdrawal (DOW) (5) 2013-02-01

Relations

Supersedes EN 61280-1-4:2003
Superseded by  
Normative reference (6) EN 60793-2-10:2007
EN 60825-1:2007
IEC 61745:1998

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.